Washington/Andora Widening Project




Community Open House & Public Scoping Meeting
On Wednesday, September 21, 2016, the City of Roseville hosted a Community Open House and Public Scoping Meeting for the Washington Blvd. / Andora Widening Project. More than 60 residents attended the open house at Vencil Brown Elementary School Multi-Purpose Room, located at 250 Trestle Road in Roseville from 6 – 7:30 p.m.

Notice of Preparation of an Environmental Impact Report for the Proposed Washington Boulevard/Andora Widening Project and a Notice of Public Scoping Meeting

Meeting summary (.pdf)


About the Project
As part of the City of Roseville’s Traffic Master Plan, the City will be widening Washington Blvd from Sawtell Road to Pleasant Grove Boulevard to improve traffic circulation and pedestrian traffic through the area. The City is currently working on the design for the Washington/Andora Widening Project, which includes widening approximately one mile of Washington Boulevard from two to four lanes to better accommodate existing and future traffic volumes. Currently approximately 18,000 vehicles and 36 trains per day travel through this location.

Road improvements will enhance accessibility for motorists, pedestrians and cyclists along Washington Boulevard and nearby intersections. The project also includes the replacement and widening of the Union Pacific Railroad Andora Bridge that crosses over Washington Boulevard.

The project team is currently undertaking technical evaluations as well as developing preliminary concepts based on technical analysis and community input. Early this fall, the project team will share the proposed design concepts at a community open house. Subscribe to receive notification of project updates and upcoming meetings. This project includes a comprehensive public engagement process which involves meeting with local businesses, residents, and schools. Construction is anticipated for 2018.  

Community Meetings
Early this summer, the City of Roseville and the project team met with both residents and local businesses about the Washington/Andora Widening Project. More than 45 community members attended the two meetings with the project team to discuss the project, ask questions and provide feedback on the project and proposed construction approach.

Feedback form (.pdf)

Resident meeting summary (.pdf)

Business stakeholder meeting summary (.pdf)



Project Location




 

View aerial map (.pdf)


View Project Fact Sheet
(.pdf)
 


Schedule
 Begin project design and environmental clearance  April 2016
 Concept design and public outreach  August 2016
 Environmental clearance  Fall 2017
 Final design  Winter 2017
 Union Pacific approval  Spring 2018
 Begin construction
 (Funding for construction has not yet been identified.  The soonest construction could begin is 2019, should funding become available.)
 Summer 2019
Construction completion if Washington Boulevard is closed for 5 months  Summer 2020
Construction completion if Washington Boulevard is open to one-way traffic  Summer 2021

Funding
The proposed project will be funded with federal and state funds and local development impact fees.

Contact Us
We welcome your input and questions about this project. Please contact Public Works by calling (916) 746-1300 or e-mailing engineering@roseville.ca.us.

Stay Informed
Subscribe to Washington/Andora Widening Project Updates e-mail/text message alerts and follow @RSVL_Traffic on Twitter.