Design/Construction Standards


City's Design and Construction Standards

City engineering staff has recently updated the City's Design and Construction Standards dated February 13, 2013. This February 13, 2013, Design and Construction Standards document replaces the prior 2010 edition. The majority of the revisions in the 2013 edition were fairly minor, although staff agreed that due to the split of the Public Works Department, the document is now technically correct by reference.

The 2013 edition may be purchased through Signature Reprographics at www.signaturerepro.com or call their Sacramento office at 916-454-0800. Through Signature Reprographics you can purchase a full printed, tabbed and bound hardcopy or you can purchase just the full printed pages to replace your previous edition pages. You may also download sections for free below.

Pending Amendments

Below is the 2014 Amendment to the 2013 Design & Construction Standards:

Email Alerts

Receive email updates when an amendment has been implemented to a standard by clicking here and signing up for the City E-notify program. Just check the box titled "Design and Construction Standards" and complete the form. If there any questions regarding signing up for the "E-notify" please contact the Development Services Department at (916) 774-5339.


Design Standards

Back to Top


Construction Standards

Back to Top



Details

Back to Top

Stormwater Quality BMP Guidance Manual for Construction

Back to Top

Development Services - Engineering
Land Development
311 Vernon Street
Roseville, CA 95678
(916) 774-5339
(916) 774-5379 Fax
(916) 774-5220 TDD


Quicklinks
Amendments
Design/Construction Standards
Details
Standard Notes
Stormwater Quality BMP Guidance Manual for Construction