Planning is underway on a project to widen Roseville Parkway, between Gibson Drive and Creekside Ridge Drive intersections. Roadway improvements at the Pleasant Grove Boulevard intersection are also included.
This six-lane arterial roadway links regional shopping and dining destinations, office buildings, and residential neighborhoods.
The project will be constructed in two phases and is part of the City Council-approved Capital Improvement Plan.
Phase 1:
• Adding a third left-turn lane on southbound Pleasant Grove Boulevard onto eastbound Roseville Parkway.
• Extending the right turn lane on northbound Pleasant Grove Blvd to eastbound Roseville Parkway.
• Adding a bus turnout on Roseville Parkway between West Drive and Reserve Drive.
• Constructing intersection improvements at Roseville Parkway and Galleria Boulevard.
Phase 2:
• Constructing remaining infrastructure to widen Roseville Parkway from 3 lanes to 4 lanes in each direction from Creekside Ridge Drive to the eastern end of Gibson Drive
- The westbound direction will be widened between Creekside Ridge Drive and Gibson Drive (east).
- The eastbound direction will be widened between Reserve Drive and Creekside Ridge Drive.
The project also involves:
• Intersection improvements including modifications to existing traffic signals.
• Construction of new lanes, sidewalks, curbs and gutters where necessary.
• Updated signage and pavement striping along the project route.
• Necessary utility adjustments.
The project is currently in the design phase.
Stakeholder engagement began in summer 2022.
Construction estimated to occur in two phases.
• Phase 1: Approximately summer 2025 - spring 2026
• Phase 2: When adequate funding is identified, which could be as soon as 2028-29.
Timeline is approximate and subject to change
The Initial Study/Mitigated Negative Declaration were available for public review and comment from March 8 to April 8, 2024 (30 days).
Final Notice of Intent to adopt Mitigated Negative Declaration
Roseville Parkway Widening Project Initial Study/Mitigated Negative Declaration
Documents can be viewed in person by appointment, at the City of Roseville Permit Center, 311 Vernon Street, Roseville, CA 95678. To schedule an appointment online:
roseville.ca.us/DS-appointment or call (916) 774-5285.
Written comments on the adequacy of the Mitigated Negative Declaration were due by 5:00 p.m. on April 8, 2024. During the public review period written comments were to be provided to:
Jessica Lynch, Environmental Coordinator
City of Roseville Development Services Department
311 Vernon Street
Roseville, CA 95678
(916) 774-5352
Email
A community open house was held:
September 20, 2022
6 – 7:30 p.m.
Catheryn Gates Elementary
1051 Trehowell Dr.
View a summary.
Contact Public Works with any project inquiries:
Email
(916) 746-1300
Design
Funding for the design phase is provided by developer-paid Traffic Mitigation Fees. These fees are gradually collected as development occurs and help the City to construct transportation projects identified in the
Capital Improvement Program. Improvements address anticipated traffic impacts from new and existing development projects.
Learn more about how Roseville plans for growth and development:
roseville.ca.us/DevelopmentDecoded.
Construction
Phase 1 construction is anticipated to be approximately $6 million and is fully funded through a combination Community Facilities District funding and developer-paid Traffic Mitigation Fees.
Phase 2 construction is anticipated to be approximately $12 million. The City is pursuing funding opportunities, including state and federal grants.