Please complete this application before applying for a Building Permit. Once we receive your application, a Roseville Electric representative will contact you to provide further direction.

Residential/Commercial Electrical Panel Upgrade Application

Name

 

Existing Panel Size

Address

 

Proposed Panel Size

Zip Code

Telephone

 

Is the panel being relocated?

Is the panel overhead or underground?

Email Address

 

Is a new meter being added for a Accessory Dwelling Unit?

If yes, please provide a brief description of proposed location:



Security Measure

Please send a photo (if possible) of the existing panel location and proposed location (if needed) to [email protected].

Electrical Panel Location Upgrade Information:

  • Please allow up to 48 hours for Roseville Electric to review your application. Once our review is complete, you will receive a phone call or email to discuss next steps. Additionally, you will receive confirmation once the application has been approved and the City of Roseville Building Department has been notified.
  • Once the Building Permit has been issued, please schedule an electrical disconnect by contacting Roseville Electric Dispatch at (916)774-5620. Please provide a 72-hour advance notice of when the panel replacement will occur.
  • Please schedule your City of Roseville Building Inspection the same day as the electrical disconnect.
  • Please be advised, the property owner is responsible for the conductors and conduits providing service to the electrical panel. In the event the panel is being upgraded to a larger size, the conduit and conductors may not meet Building Code and will need to be upgraded at the applicant's cost. (Roseville Electric does not install Secondary Conductors).
  • If the applicant is installing a new meter for a Accessory Dwelling Unit a Roseville Electric Representative will contact the applicant to discuss options.
Electric service entrance requirements