Our Permit Center counter services will be closed to the public on Wednesday, December 4, 2024, from 8:00 a.m. to 9:00 a.m. for a department meeting, and on Wednesday, December 18, 2024, from 11:00 a.m. to 1:00 p.m. for a division meeting. We apologize for the inconvenience and thank you for your patience.

City offices, including the Permit Center, will be closed Wednesday, December 25, 2024, to Wednesday, January 1, 2025. The Building Division will have limited inspection staff available and as a result will provide inspections on a priority basis. To schedule a building visit 
www.roseville.ca.us/scheduler.

Welcome to the Engineering - Land Development Division

The Engineering - Land Development Division works with land developers and residents to provide acceptance of their civil construction projects. This is accomplished through the review and conditioning of the project’s Planning Entitlements, the review and acceptance of civil construction documents, issuance of civil Improvement, Encroachment, and Grading Permits, and by providing inspection and acceptance of the constructed improvements. The Engineering – Land Development Division is responsible for the review, inspection, and acceptance of all improvements proposed within public right-of-way or easements, including, but not limited to the following: 

  • Roadway surface improvements;
  • Curb, gutter, and sidewalk;
  • Driveway – locations, widths, depths;
  • Grading and surface drainage;
  • Storm drain system;
  • Water quality during and post construction.

Need help preparing your documents or applying for your permit?

Visit the Development Services online permit center by clicking on the image below.
 

 
Other Helpful Quick Links